Description
Maximum pressure whereas the weight of the platform plus the maximum load on the basket are completely distributed on only one side of the platform (totally asymmetric load)
By ‘work cycle’ we mean a self propelled movement of 20 m with a full ascent to and descent from the maximum height and with adjustment of the loading platform